DMG’s Building Inspection Report (BI) Identifies deferred conditions and provides recommendations for remedy or repairs. This is a great tool for a buyer or new tenant of commercial property to identify what the current condition of the building is in and what items need to be fixed and repaired or what further investigation may need to be done.
Building Inspection Process to include:
1. Conduct walk through survey
2. Evaluate the building and site of deferred conditions
3. Recommendations for remedy/repair
4. Comprehensive written and photographic report
Report completed within 1-2 working days
————————————————————————--
Photographic written report includes the following categories:
Visual Assessment of the following installations:
Excludes:
Building Inspection Process to include:
1. Conduct walk through survey
2. Evaluate the building and site of deferred conditions
3. Recommendations for remedy/repair
4. Comprehensive written and photographic report
Report completed within 1-2 working days
————————————————————————--
Photographic written report includes the following categories:
- Structure
- Electrical
- Heating/Air Conditioning
- Ventilation
- Plumbing
- Roofing
- Interior
- Exterior
- Fire Sprinkler Certification & Extinguisher Tags
- The 5-year cert. for the fire sprinkler riser will be photographed and documented IF visible to verify if it is current or expired.
- The fire extinguisher tags will be photographed and documented IF visible to verify if they are current or expired.
- NO TESTING OF FIRE SPRINKLER or ALARM SYSTEMS WILL BE DONE, due to licensed cert. qualifications.
Visual Assessment of the following installations:
- Roofing membrane: Including soffits, flashing
- Parking lot: Potential for paving deterioration
- Offices: Condition of architectural finishes
- Structural components: Foundation, Floor, Walls, Ceiling & Roof Structure
- Interior: Components: Windows, doors, stairs, flooring, wall coverings
- Exterior: Walls, doors, windows, woodwork, decks, grading, sidewalks, parking lots, retaining walls, fence, signage
- Heating & Air Conditioning equipment
- Electrical: Main Panel, Auxiliary Panels, Switches, Lighting, Fixtures
- Plumbing: Water Supply Source, Waste, Vent Piping, Fixtures, Water Heater, Condition of fixtures
Excludes:
- Investigative work and other investigative work such as:
- Interviews, ADA compliance, building code requirements, building violations, building permits, As-built drawings review, historical documentation, legal documentation of any kind, past engineering or contracting methodologies, and plans or remedies, etc.
- Fire sprinkler systems, risers, fire alarm systems, and life safety systems
- Manufacturing or any equipment related to the business operations
- Invasive testing
- Environmental assessments that also include the identification of asbestos, lead, mold or moisture intrusion
- Landscaping & Irrigation systems
- Sump pumps and all underground equipment
- Conditions in inaccessible areas, i.e. interior space between roof decks and acoustical drop ceilings
- We do not pop open ceiling tiles
- We do not test individual electrical wall outlets
- Crawl spaces and attics
- Termite investigation
- No warranty is either expressed or implied
24-48 HOUR TURN AROUND
|