DMG's Inspections are designed to meet our clients needs.
Each Inspection Report goes up in grade, for example;
the BI is included in the BAR, and the BAR is included in the PCA.
Choose one that best suits your needs.
Each Inspection Report goes up in grade, for example;
the BI is included in the BAR, and the BAR is included in the PCA.
Choose one that best suits your needs.
3 Different Inspections Explained
DMG’s BI identifies deferred conditions and provides recommendations for remedy or repairs.
Building Inspection Process to include: 1. Conduct walk through survey 2. Evaluate the building and site of deferred conditions 3. Recommendations for remedy/repair 4. Comprehensive written and photographic report Report completed within 1-2 working days ————————————————————————-- Photographic written report includes the following categories:
Audit of the following installations:
Excludes:
|
DMG’s BAR identifies immediate and itemized costs of repairs to bring back the building into good condition.
The BAR combines a Building Inspection plus an itemized cost table of recommended repairs. Building Assessment Process to include: 1. Conduct walk through survey 2. Evaluate the building and site of immediate needs 3. Recommendations for remedy/repair 4. Itemized COST TABLE of suggested remedies of repairs, replacements & significant maintenance items 5. Comprehensive written and photographic report Report completed within 1-2 working days ————————————————————————-- Photographic written report includes the following categories:
Audit of the following installations:
Excludes:
|
DMG’s PCA identifies deferred conditions, physical aspects of the property of expected useful life, a cost table for immediate needs repairs, reserve costs over a 12-year term, a simple ADA checklist, and city records research.
The PCA combines a Building Inspection and a Building Assessment plus adds expected useful life, reserve costs, simple ADA checklist and city records research. Property Condition Assessment process to include: 1. Conduct walk through survey in accordance to all ASTM E 2018-01 standards for compliance 2. Evaluate the building and site of immediate needs 3. Assess the expected useful life (EUL) of major building components 4. Readily available document review (any as built plans, etc) and property manager interview (if made available) 5. All building records/ permits/ violations of the Site property at the city 6. Itemized Immediate Needs COST TABLE of suggested remedies of repairs, replacements & significant maintenance items 7. Cost evaluation Reserves Table over a 12-year term 8. Simple ADA checklist 9. Comprehensive written and photographic Report Report completed within 7-10 working days ————————————————————————-- Photographic written report includes the following categories:
Report includes the following categories:
Excludes:
|
PRICING
Costs vary and are site specific based on Building Square Footage, Multiple Tenants/Stories/Units/Suites/Parcels/Structures and Year Built. We always ask for the properties brochure or flyer so we can give an exact price.
Costs vary and are site specific based on Building Square Footage, Multiple Tenants/Stories/Units/Suites/Parcels/Structures and Year Built. We always ask for the properties brochure or flyer so we can give an exact price.